Garage:
Clean up - yes, they left everything including the trash
Garage door openers x2
Fix storm door
Shelving
Peg board for tools
Only update here is that I park my car in here during snow storms. It's a disaster still.
Downstairs Living Room/Kids Room:
Paint- partially done
New flooring
Lights (?)
New windows (?)
Downstairs Bath:
New Flooring
New vanity counter
Vanity hardware
New toilet paper roll
New Faucet
Laundry:
New top for folding table
Clean out closet
New Washer/Dryer
Hanging drying rack (?)
Paint
Floors
Downstairs Bedroom/ Office:
Floors
Paint
Curtain and shade
Stairway:
Paint
Tile in front of doorway
New carpet on stairs
New door/windows
Fan instead of super 80's chandelier
Upstairs Living Room:
Paint- accent wall done
Floors
New cable outlet
Built-ins next to fireplace
Mantle
Dining Room/Kitchen:
Flooring
Paint
Trim paint
Lights
Sliding glass door where glass doors are
Hallway:
Paint
Flooring
New doorbell
Upstairs Bathroom:
Flooring
Paint ceiling
More shelving in closet
New vanity countertop (?)
New mirror
New window
New (non gold) Shower hardware
Boys Room 1:
Paint - accent wall
Electrical for light
Fan
New shade
New windows x2
New heater
Boys Room 2:
Trim paint
New windows x4
New heater
Master Bedroom:
Paint
Trim paint
Ceiling paint
New windows x2
New heater
Master Bathroom: Can I just say GUT? This is the worst room in the house
Paint
Trim paint
Ceiling paint
New window
Extra shelving x100000000000000
New counter for vanity
New vanity light
New shower
Floors
New faucet
Shower door
My goal is to ignore the Master Bathroom and eventually gut the bathroom and two hallway closets and somehow incorporate them into one. Or, build a Master suite addition and not worry about anything but updating hardware and paint in the Master Bath.
Hmm, I thought this was supposed to make me feel good....
No comments:
Post a Comment